Edit resource

Production > Resources > Edit resource

Top  Previous  Next

Resource master data

The term “resources” refers to productive resources that are planned as the smallest capacity unit.  Only through the correct entry of resources is it possible to receive information on the capacity situation, determine lead times for work orders, or estimate manufacturing costs for the calculation.

 

PATH: Resources > Resource Master Data.

or

PATH: Resources > Resources.

Resource_master

Window stamm_arbplatz_edit.psr

 
Header

Field

Meaning

Resource

Unique identification, max. 20 characters.

The following characters are not permitted:

Space, equals sign, comma, <, >, quotation marks, apostrophe, &, %, &ouml;, &uuml;, &auml;, &szlig;

Description

Long description of the resource.

Group

ID of the group to which this resource belongs.

 

Description of tabs

Tab

Meaning

General

General definition of the resource.

Scheduling

Plan utilization or availability of a resource.

Costs

Specification of the costs at marginal and full costs and allocation of cost elements .

Cost details

The marginal and full cost rate can be specified here in further details.

Attachments

3 images or documents can be stored per resource.

Documents

Documents can be stored per resource.

Expendable material

The continual expendable material can be stored for a machine here.

Extended

Further Setup.

Interruption

The reported interruptions can be displayed and revised here.

Maintenance Orders

Displays all maintenance orders linked to this tool.

(beas9.1-008-040-003)

 

Buttons

Button

Meaning

Reference

Opens the Item cross reference. All routings, operations and work orders are displayed containing this resource.

Dispatches

Displays current dispatches.

 

linktraining

Training unit master data resources

 

 


Help URL:http://www.beascloud.net/docs/help/online_eng/index.html?ressource_bearbeiten.htm